This is particularly important for vertical installation.
Installing vertical cedar channel siding.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Do not nail through overlaps.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
Yes we re aware that cedar is also a wood but it is in such demand that it deserves its own section.
For horizontal applications start with the bottom course and work up with the channels pointing upwards.
Furring strips must be thick enough to allow for nail penetration of 1 1 4 in into solid wood with ring shank nail table 4.
Your j channel should extend into corner post and always remember to allow a 1 4 for expansion.
For a quality installation it s important to install the cedar siding according to western red cedar lumber association guidelines.
Install your corner posts even with or slightly below that chalk line.
The dupont tyvek drainwrap is a quality barrier with built in channels to channel away excess water.
Features of recommended nails.
The one aspect with cedar siding to remember is that it is wood product and needs to be handled with some specific care.
A vapor barrier is also recommended with cedar siding.
Lately we are seeing more channel lap vertical applications.
This is a variant on the new shadaw gap narrow 1 4 shadow line profile that is popular now.
For instance even though cedar is naturally resistant to moisture and to the elements in general which makes it the ideal natural siding material it is still sensitive.
Tips on installing cedar siding.
2 minutes cedar siding is a beautiful addition to any home adding character and charm.
If your home has cedar shakes and shingles you re going to create an exceptional look with vertical cedar siding.
Lap siding can be installed horizontally or vertically.
If you choose to install channel siding vertically be sure to bevel cut the ends and install so water is directed to the outside.
Channel 3 4 2 6d 7 8 2 1 4 7d battens for board 3 4 3 10d and batten figure 2.