Yes depending on the style flooring you choose.
Installing bamboo flooring on concrete.
Bamboo flooring can be either glued down to concrete or screed or floated over an underlay.
Can i install bamboo on a concrete slab.
There are four different ways to install plank style bamboo flooring and only one way to install parquet block bamboo.
Bamboo flooring is very versatile and can be installed on almost any sub floor.
Clean the floor well with a pressure washer if it is an older concrete floor to remove any sealers.
Now it is essential that the bamboo flooring must be acclimated with the concrete before installing it.
Floating the floor using uniclic flooring.
Use a moisture test kit to ascertain the level of moisture in the floor and therefore the amount of time the bamboo planks should be laid out on the concrete.
Floating the floor using tongue and groove flooring not parquet block 2.
Allow the concrete floor to cure for between 60 and 90 days if new before installing the bamboo.
The morning star or supreme bamboo tongue and groove floors and morning star click floors can be glued down to concrete on or above grade using adhesive.
Before you start to install your bamboo flooring you must ensure your sub floor is flat level dry and clean.
Secret nailing the floor down to a wood subfloor.
For both wood and concrete subfloors the radiant heat should be turned on for approximately one week to ensure excess moisture is removed.
The two main installation methods over concrete.
Gluing the floor down to a concrete or wood.
The most important factor is to use an approved urethane wood floor adhesive with vapor sound barrier and the trowel that is used specifically for that adhesive in this method you will adhere the bamboo flooring directly to the concrete slab.
This is particularly applicable if the concrete slab was laid within the previous 60 days as this is generally considered to be too freshly laid for a sufficient curing period prior to installation.
Bamboo wood floor can be installed in a number of different ways over different substrates.
We offer bamboo styles that can be nailed to wood subfloors glued down or floated over concrete.
The glue down method can be used for solid or engineered bamboo flooring.
If installing glueless click bamboo on concrete the concrete should be fully cured 30 60 days before beginning preparation for flooring.
When you are done you will have a very solid durable floor to use for many years.
If you install bamboo flooring on a concrete subfloor you must check the concrete for moisture content first using a standard moisture meter.