First in the event of carpet installation the gap will need to be there for the edges of the carpet to be tucked under.
Install base molding or carpet first.
If adding baseboards after carpet is laid it should be installed at the same height as without carpet.
Generally the installation of carpet or baseboard is easier for whoever installs first.
The reason i feel this way is because nearly every time i ve seen carpeting installed with molding on one or both of the following happens.
Hold the first board against the wall level it then temporarily tack it in place.
Then touch up base if need be.
The first is to install the baseboards flush to the subfloor prior to carpet installation.
Ask your carpet installer their preference to begin the discussion.
There may be instances where you want to put the carpet down first.
Baseboard trim has nothing to do with holding carpeting in place.
Or you may be replacing the baseboards but leaving the carpet.
Which comes first carpet or baseboard.
This could result in a tight fit based upon how close to the wall the tack strips are placed normally the old tack strips are not replaced when installing new carpet.
1 the act of installing the carpet destroys the molding or 2 it looks like shit afterward because of a poor fit between the new flooring and the old molding.
If you plan to install baseboard moulding before adding carpet it needs to be installed 1 inch above floor level to allow room for both pad and carpet.
How to install base board trim for carpet areas.
How to install carpet first.
There are three main ways to install new baseboards.
Second drywall would wick up moisture from flooded floors or carpet.
Some professionals may have a strong preference but ultimately baseboards can be installed before or after carpet.
When glue doesn t secure the carpet tack strips installed on the floor near.
Believe it or not a crowbar works great to help push the carpet into the gap.